
4
6 Installation
1. Select panel location away from direct contact with water
and oil.
2. Conrm clearance for wire connections behind wall, hull
liner or bulkhead.
3. Using indicator panel template (g. , page 5), cut out
panel access hole and drill fastener holes.
4. With electrical power off, route 18-gauge stranded copper
wire from power source, through 0.5 amp fuse (not provided),
to panel location. Route 18-gauge stranded copper wire from
holding tank probe cap to panel location. Make sure wires
extend out through access hole (g. 2, page 2).
5. Install mounting frame (g. 1, page 2) with four fasteners.
6. Make proper 12 or 24 V DC wiring connections to indicator
panel. Refer to wiring diagram (g. , below).
7. Push indicator panel onto mounting frame until it locks
into place.
6.1 Indicator Panel (g. , page 2)
Indicator Panel Template
Dimensions (g. , page 5)
3
5
Dometic Tank MonitorInstallation
5.4 Dimensions
Caution!
Do not install indicator panel in an atmosphere with potentially flammable or
explosive vapors.
Ref. Dimension
A 83 mm (3.25 in.)
B 51 mm (2 in.)
C 67 mm (2.63 in,)
D 35 mm (1.38 in.)
E 25 mm (1 in.) dia.
F 2 mm (0.10 in.) dia.
G 51 mm (2 in.)
clearance behind wall
5
6
6
3
3
51 mm
(2 in.)
83 mm
(3.25 in.)
10 mm
(0.38 in.)
51 mm (2 in.) minimum
clearance behind wall
111 mm (4.38 in.) dia
136 mm (5.3 in.)
Kommentare zu diesen Handbüchern